Per Peggy's assignment here is a posted schedule:
At this time I have prepared for my thesis such that I need: a second IMD advisor, a proposal document, and a polished presentation. This week I did:
3/26/2008 Present work-in-progress to first potential IMD advisor. Construct alphabet prototype. Build installer.
Next week I am speaking at AISB in Scotland on simulation and story analysis in game design.
4/3/2008 N/A (present simulation and story analysis)
The following weeks, for the proposal I am doing the following:
4/10/2008 Present work-in-progress to second potential IMD advisor.
4/17/2008 Draft proposal. Submit to Advanced Game Project.
4/25/2008 Revise proposal. Prepare proposal presentation.