April 06, 2005

Telmahre: First Draft Production Schedule


Short-Term:

April 7 or 10 – Meet with Kellee and see if we can come up with a model for the dramatic structure of the character scenes.

Weekend of April 8-10:

– Do one of these writing exercises:

1) Free-write on Tobias’ obsession, then write out a version of this and what the ractor witnesses of it in Act II, Seq. 1 as if it is due. Possibly meet with Ken for brainstorming help.
2) Free-write on what things the ractor should learn about each character (Tobias, Edana, Claude) in each of the three Act II sequences. Write out a list of key points for each scene and some possible endings.

– Add multi-path support to the Tantallon state machine and test with several video clips.
– Fix NavNode bugs.

April 12: Present the problem of the “climax sequence” (Act III) to Peggy’s class.

Week of April 11-14:

– Email Jess and Ken about art for the May 5th package.
– Contact SCFX (Again!) regarding Telmahre.
– Visit or email Joe Wallenstein regarding stage priority questions.

Weekend of April 15-17:

– Do the other Act II writing exercise you didn’t do last weekend, and/or work on some ideas for the climax sequence in Act III.
– Plan to meet with Jess one more time to run things by her that still allude you.
– Assemble the “Dinner With Tobias” prototype—get all video clips in there.

Week of April 18-21: Type up a first draft plan for the thesis pitch presentation.

Weekend of April 22-24:
– Revise thesis pitch outline and determine what is needed for presentation.
– Render and prep any artwork needed for the thesis pitch.
– If time, throw together the art for several NavNodes in the “Dinner With Tobias” prototype.
– Finalize “Dinner With Tobias” prototype.

April 25-27: Test “Dinner With Tobias” on ZML computers and tweak/debug as necessary so it runs on Thursday.

April 28: Pitch Telmahre to CTIN 548 class.

Week of April 30-May 4: Write/prepare thesis “paper goods.”

May 5: Turn in Thesis packet.

May 6 (Tentative): Go surfing!


Long-Term Schedule (Rough & Preliminary):

May (as per Jess’s availability) – Improv the major scenes and see what kinds of character tactics & variances we can find.

May 31 – Have detailed outlines of all scenes written, including first-draft floorplans/sketches.

June :
– Start thinking about & planning the optimal “Telmahre Version” of the Tantallon engine.
– Begin to get the telmahre.com website going.

June 30 – Complete first-draft versions of the screenplay. Don’t worry if the dialogue sucks at this point.

July 31:
– Production-ready screenplay.
– Solid production plan completed (Jess, Me, possibly Dan Burch) including locations list, crew requirements, etc.
– Telmahre.com officially launched (in time for SIGGRAPH)

Early August – Casting, finding crew, getting locations.

Mid-To-Late August – Begin Production (shooting of principal photography).

October 1 – Principal photography complete.

October-November 2005:
– Pick up Tantallon again and work hardcore on getting this ready to run Telmahre, including (perhaps) voice input.
– Secondary location photography.
– Determine which tech, art, and post-production tasks you will do personally; commission the rest.
– Find composer, begin discussing foley needs with sound designer (Elisa).
– Pass applicable footage to SCFX so they can begin working on.

December – One “art-and-foley free” scene completed and fully-functional.

January-February 2006 :

– Hit foley and music integration hardcore.
– Secondary locati
– Assemble all remaining scenes with actual footage and place-holder art.

March 1, 2006: Final artwork completed; functional alpha version with placeholder art & music.

March 2006: Integrate actual art, backdrops, music and foley.

April 1: Fully working beta.


Posted by msteffen at April 6, 2005 11:53 PM